...
.Nscale Locks $3.5 Billion Figure Robotics Compute Deal  ·Qatar’s Meeza Lands Major Hyperscaler Deal for 8MW ·Qualcomm Strikes Amazon AI Chip Deal, Opens Door to $4 Billion Stock ·Hitachi Energy Bets $300M on China Grid Manufacturing Corvex Builds Toward 8MW Cloud Infrastructure Footprint LITEON Bets $176 Million on DCX Liquid Cooling EdgeConneX Backs Singapore’s AI-Ready Tropical Data Center Testbed
.Nscale Locks $3.5 Billion Figure Robotics Compute Deal  ·Qatar’s Meeza Lands Major Hyperscaler Deal for 8MW ·Qualcomm Strikes Amazon AI Chip Deal, Opens Door to $4 Billion Stock ·Hitachi Energy Bets $300M on China Grid Manufacturing Corvex Builds Toward 8MW Cloud Infrastructure Footprint LITEON Bets $176 Million on DCX Liquid Cooling EdgeConneX Backs Singapore’s AI-Ready Tropical Data Center Testbed

Latin America

Brazil, Mexico, Chile, and the region racing to become the Western Hemisphere’s next compute hub —
powered by hydro, sun, and surging enterprise AI demand.
Articles
0
Markets
0
Committed
$ 0 B

Latest from Latin America

142 Articles

Uruguay President Yamandú Orsi signed an agreement on Wednesday with Spanish energy group Solaria Energía y Medio Ambiente to build

Target Latin America’s infrastructure decision-makers with precision

Region-specific placement · computeforecast.com/advertise

More from Latin America

Long Reads

88 deep investigations & features

An electrical shelter can receive a cooling system that meets its specified tonnage and still

A newly constructed data hall can look complete long before its electrical infrastructure can support

A large industrial site can have electricity secured, a cooling strategy approved, and a telecommunications

Water that appears clean when it enters a data center does not necessarily remain suitable

Regional Opinion

AI infrastructure mismatch

The utmost important question to ask about the AI infrastructure boom is how long will the capacity actually be relevant?

Data Center Risks

Whilst there may be obvious risks in relation to new restrictions, delays to approvals or local objections, data center development

AI power access

New AI infrastructure can be financed, land can be acquired, cooling designed and computing infrastructure ordered, but there is no

AI Infrastructure Funding

A data center can look financially compelling long before it becomes commercially productive. Developers can secure a site, arrange financing,

Data Center Liquid Cooling

The most consequential part of a liquid cooling system may be the part nobody sees. Behind the racks, processors and

AI Waste Heat

A data center’s thermal output presents an unusual engineering contradiction. The same computing equipment that generates heat requiring continuous removal

Practitioner Blogs

318 practitioner blogs

There are plenty of moments in the lifecycle of a data center project when it

Liquid cooling can remove a substantial share of the thermal burden from a data hall,

AI infrastructure has changed the way electricity demand behaves, and that change is exposing weaknesses

Quantum processors will not eliminate the infrastructure that supports conventional computing, because their operating requirements

Industry Intelligence

46 reports & datasets

As AI accelerates infrastructure demand, power delivery is becoming the defining constraint of scale.

Speed has become the defining currency of the AI era. But in the race to deploy faster, scale bigger, and

As artificial intelligence evolves from experimental deployments into foundational digital infrastructure, the conversation is increasingly shifting beyond model performance toward

Scroll to Top
Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.