.Nscale Locks $3.5 Billion Figure Robotics Compute Deal  ·Qatar’s Meeza Lands Major Hyperscaler Deal for 8MW ·Qualcomm Strikes Amazon AI Chip Deal, Opens Door to $4 Billion Stock ·Hitachi Energy Bets $300M on China Grid Manufacturing Corvex Builds Toward 8MW Cloud Infrastructure Footprint LITEON Bets $176 Million on DCX Liquid Cooling EdgeConneX Backs Singapore’s AI-Ready Tropical Data Center Testbed
.Nscale Locks $3.5 Billion Figure Robotics Compute Deal  ·Qatar’s Meeza Lands Major Hyperscaler Deal for 8MW ·Qualcomm Strikes Amazon AI Chip Deal, Opens Door to $4 Billion Stock ·Hitachi Energy Bets $300M on China Grid Manufacturing Corvex Builds Toward 8MW Cloud Infrastructure Footprint LITEON Bets $176 Million on DCX Liquid Cooling EdgeConneX Backs Singapore’s AI-Ready Tropical Data Center Testbed

Vertiv Collaborates with Zagreb University of Applied Sciences to launch New Data Center Design Professional Program

Education initiative equips technical professionals with expertise in modern data centre tools and practices LONDON, UK [26 February 2026] – Vertiv (NYSE:

Share
Vertiv

Education initiative equips technical professionals with expertise in modern data centre tools and practices

LONDON, UK [26 February 2026] – Vertiv (NYSE: VRT), a global leader in critical digital infrastructure, has collaborated with the Zagreb University of Applied Sciences (TVZ), to launch a new specialised Data Center Design program within the Electrical Engineering Department. This professional program opens pathways to careers in the data centre industry and prepares participants to contribute to Croatia’s (and Europe’s) digital future. It represents a strategic advancement in higher education, addressing the growing demand for skilled professionals in the expanding digital infrastructure market. Applications are now open for the February classes.

The Data Center Design program aims to provide participants with an in-depth understanding of the key technical aspects of data centre design and optimisation, with a particular focus on power systems. Through practical exercises, working with software tools, and real-world engineering problem solving, participants can gain the skills needed to conceptualise, implement, and maintain systems that meet the highest standards for energy efficiency and safety in today’s industries.

Led by associate professor Dr. Stjepan Tvorić, head of the Electrical Engineering Department, the program has been developed in accordance with the current industry requirements and the latest technologies used in critical digital infrastructure. Thanks to its close collaboration with Vertiv, the program provides students with direct access to experienced subject matter experts in electrical engineering, data centre infrastructure, and power systems, advanced technologies, and practical insights drawn from real-world projects. The program is intended for electrical engineers and professionals from electrical or related technical fields seeking to advance their expertise. It emphasises technical proficiency, analytical skills, and the use of modern computer-aided design (CAD) and engineering tools.

Dr. Tvorić said: “We are extremely pleased to have launched the Data Center Design program at the Department of Electrical Engineering, developed in close collaboration with Vertiv, one of the global leaders in the field of digital infrastructure. This partnership provides our participants with direct insight into real industrial processes and the most advanced technologies used in modern data centres. Collaborating with Vertiv means we are engaged in discussions about current engineering challenges, using real project examples and case studies, and implementing tools and methods required by today’s industry. Participants will build competencies that are highly sought after in the job market – from designing power and cooling systems to optimising infrastructure in line with real-world standards. We believe that programs grounded in real industry knowledge and experience play a vital role in preparing the next generation of professionals to shape the future of electrical and information infrastructure.”

Program participants will design electrical installations and power systems using CAD tools and gain hands-on experience in installation and maintenance. The program is fully funded through adult education vouchers from the Croatian Employment Service (HZZ) as part of the Croatian’s national education initiative, making it accessible to eligible candidates looking to upskill for in-demand careers.

Vedran Brzić, vice president for infrastructure solutions for Europe, Middle East and Africa at Vertiv emphasised the importance of the partnership, stating: “Vertiv and the Zagreb University of Applied Sciences have built a strong long-term partnership through various joint projects. One of the key outcomes is the launch of a data centre design studio in Rugvica, offering students real-world experience that can be leveraged in career opportunities in a rapidly growing sector. We are also proud to employ skilled TVZ alumni, and also at our production facility in Rugvica, empowering local talent. Also, we are seeing strong demand for data centre professionals across all industries, and this initiative helps students gain the skills needed to meet that demand.”

Detailed information on the program and the application procedure is available on the official TVZ website. To learn more about Vertiv, visit Vertiv.com.

About Vertiv

Vertiv (NYSE: VRT) brings together hardware, software, analytics and ongoing services to enable its customers’ vital applications to run continuously, perform optimally and grow with their business needs. Vertiv solves the most important challenges facing today’s data centres, communication networks and commercial and industrial facilities with a portfolio of power, cooling and IT infrastructure solutions and services that extends from the cloud to the edge of the network. Headquartered in Westerville, Ohio, USA, Vertiv does business in more than 130 countries. For more information, and for the latest news and content from Vertiv, visit vertiv.com.

Forward-looking statements

This release contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, Section 27 of the Securities Act, and Section 21E of the Securities Exchange Act. These statements are only a prediction. Actual events or results may differ materially from those in the forward-looking statements set forth herein. Readers are referred to Vertiv’s filings with the Securities and Exchange Commission, including its most recent Annual Report on Form 10-K and any subsequent Quarterly Reports on Form 10-Q for a discussion of these and other important risk factors concerning Vertiv and its operations. Vertiv is under no obligation to, and expressly disclaims any obligation to, update or alter its forward-looking statements, whether as a result of new information, future events or otherwise.

For media inquiries, please contact:
susanna.collins@apodpr.co.uk

[simple-author-box]

More from AI Infrastructure

OpenAI Anchors Firmus Expansion Into Malaysia Firmus Technologies has signed a multi-year strategic partnership

STL is expanding its data center connectivity portfolio with US certification for Optical Fiber

PowerSecure has signed an agreement with Keel Infrastructure to deliver an integrated backup power

COMPUTE WEEKLY

The briefing that 40,000+ tech leaders read every Monday. Sharp, fast, essential.

Building an AI Startup Without Owning GPUs

Not owning GPUs has become the default, deliberate strategy for building an AI company — not a compromise founders accept reluctantly. H100 rental rates fell 64-75% in fifteen months, a dense ecosystem of neoclouds and inference-as-a-service providers now lets startups skip infrastructure entirely, and credit programs can fund a company’s first year before a founder writes a check
Most Read

A fire strategy becomes expensive when the building has already decided where walls, equipment,

An AI cluster can appear healthy on a capacity plan while sitting on top

A data center can look remarkably successful on the day it opens and still

A modular deployment becomes strategically different when the next site is already waiting before

A data center master plan can establish a defined technical basis before all future

Disruptor Spotlight

Cerebras Systems

The chip that makes Nvidia nervous. Cerebras’ Wafer Scale Engine is rewriting the rules of AI inference at scale.
Faster
0 x
YoY Revenue
0 x
Transistors
0 T
Market Pulse
MSFT
+1.02%
NVDA
+0.66%
AMZN
-0.078%
AMD
-6.95%
TSMC
-2.98%
Indicative only · Not financial advice
Upcoming Events
SEP
The AI Infrastructure Race (India)
WEBINAR · ONLINE
The AI Infrastructure Race: Won on Power, Land and Trust — Not Capital
MAY
0
AI Infrastructure Summit
DUBAI · IN PERSON
MEA’s premier AI infrastructure event.
JUN
0 0
Compute Forecast Summit
SINGAPORE · IN PERSON
Our flagship APAC event. Early bird open.
Latest Moves
Live
ecolab
Ecolab Deepens Cooling Strategy With $4.75B CoolIT Acquisition
Ecolab is making one of its biggest moves yet into AI infrastructure after completing its $4.75 billion acquisition of liquid cooling specialist CoolIT Systems
Pure DC AVK Europe data center microgrid Dublin 110MW AI infrastructure Ireland 2026
Pure DC and AVK Deploy Europe’s First 110 MW Data Center Microgrid in Dublin
The Pure DC Dublin microgrid has made history as Europe’s first large-scale on-site data center microgrid, launched in partnership with power solutions provider AVK at Pure DC’s campus in Ireland.
Pace Digitek
Pace Digitek Partners With MEGMEET to Expand AI Data Center Power Business
India’s AI infrastructure ecosystem continues to mature as domestic technology manufacturers move beyond traditional telecommunications and industrial markets toward high-growth digital infrastructure opportunities
Follow Compute Forecast
11K followers
1200 followers
Companies to Watch
CW
CoreWeave
Neo Cloud · $19B · IPO Watch
CB
Cerebras Systems
AI Hardware · $4.25B · Pre-IPO
G42
G42
Sovereign AI · Abu Dhabi
H
Humain
Saudi AI · $40B Fund
Latest Podcast
AI Capex, Cloud Margins & the Nuclear Bet
48 MIN · 25 APR 2026

Vertiv Collaborates with Zagreb University of Applied Sciences to launch New Data Center Design Professional Program

Education initiative equips technical professionals with expertise in modern data centre tools and practices LONDON, UK [26 February 2026] – Vertiv (NYSE:

Share
Vertiv
18
847 SHARES

0
SHARES

[simple-author-box]

More from AI Infrastructure

A fire strategy becomes expensive when the building has already decided where walls, equipment,

An AI cluster can appear healthy on a capacity plan while sitting on top

A data center can look remarkably successful on the day it opens and still

A modular deployment becomes strategically different when the next site is already waiting before

COMPUTE WEEKLY

The briefing that 40,000+ tech leaders read every Monday. Sharp, fast, essential.

Great! We’ve received your information.

Global AI Infrastructure Outlook 2026

The briefing that 40,000+ tech leaders read every Monday. Sharp, fast, essential.
Download Free
Most Read

A fire strategy becomes expensive when the building has already decided where walls, equipment,

An AI cluster can appear healthy on a capacity plan while sitting on top

A data center can look remarkably successful on the day it opens and still

A modular deployment becomes strategically different when the next site is already waiting before

A data center master plan can establish a defined technical basis before all future

Disruptor Spotlight

Cerebras Systems

The chip that makes Nvidia nervous. Cerebras’ Wafer Scale Engine is rewriting the rules of AI inference at scale.
Faster
0 x
YoY Revenue
0 x
Transistors
0 T
Market Pulse
NVDA
$924.60
+2.4%
MSFT
$421.30
+1.1%
AMZN
$192.80
-0.6%
NVDA
$924.60
+2.4%
NVDA
$924.60
+2.4%
Indicative only · Not financial advice
Upcoming Events
MAY
0 0
DCD Global — London
LONDON · IN PERSON
World’s largest DC event. CF is media partner.
MAY
0
AI Infrastructure Summit
DUBAI · IN PERSON
MEA’s premier AI infrastructure event.
JUN
0 0

Compute Forecast Summit

SINGAPORE · IN PERSON
Our flagship APAC event. Early bird open.
Latest Moves
  • Live
Sam Altman
OpenAI appoints new Chief Infrastructure Officer to lead $100B DC programme
27 APR · OPENAI
Sam Altman
OpenAI appoints new Chief Infrastructure Officer to lead $100B DC programme
27 APR · OPENAI
Sam Altman
OpenAI appoints new Chief Infrastructure Officer to lead $100B DC programme
27 APR · OPENAI
Follow Compute Forecast
18.4K followers
12.1K followers
9.3K subscribers
41 episodes
Companies to Watch
CW
CoreWeave
Neo Cloud · $19B · IPO Watch
CB
Cerebras Systems
AI Hardware · $4.25B · Pre-IPO
G42
G42
Sovereign AI · Abu Dhabi
CW
Humain
Saudi AI · $40B Fund
Latest Podcast
AI Capex, Cloud Margins & the Nuclear Bet
48 MIN · 25 APR 2026
Scroll to Top