.Nscale Locks $3.5 Billion Figure Robotics Compute Deal  ·Qatar’s Meeza Lands Major Hyperscaler Deal for 8MW ·Qualcomm Strikes Amazon AI Chip Deal, Opens Door to $4 Billion Stock ·Hitachi Energy Bets $300M on China Grid Manufacturing Corvex Builds Toward 8MW Cloud Infrastructure Footprint LITEON Bets $176 Million on DCX Liquid Cooling EdgeConneX Backs Singapore’s AI-Ready Tropical Data Center Testbed
.Nscale Locks $3.5 Billion Figure Robotics Compute Deal  ·Qatar’s Meeza Lands Major Hyperscaler Deal for 8MW ·Qualcomm Strikes Amazon AI Chip Deal, Opens Door to $4 Billion Stock ·Hitachi Energy Bets $300M on China Grid Manufacturing Corvex Builds Toward 8MW Cloud Infrastructure Footprint LITEON Bets $176 Million on DCX Liquid Cooling EdgeConneX Backs Singapore’s AI-Ready Tropical Data Center Testbed

Latin America

Brazil, Mexico, Chile, and the region racing to become the Western Hemisphere’s next compute hub —
powered by hydro, sun, and surging enterprise AI demand.
Articles
0
Markets
0
Committed
$ 0 B

Latest from Latin America

142 Articles

Stonepeak-backed Cirion Technologies has separated its data center operations into a standalone business, introducing Datrix as a dedicated platform for

Target Latin America’s infrastructure decision-makers with precision

Region-specific placement · computeforecast.com/advertise

More from Latin America

Long Reads

88 deep investigations & features

Heat recovery has an unusual commercial problem: the energy can exist without being available when

Environmental Accountability Begins Before a Data Center Becomes Operational A contractor signs off the final

A long-term AI capacity agreement can look commercially attractive when computing demand is rising, hardware

Wildfire smoke rarely announces its operational consequences when it first reaches an industrial site. The

Regional Opinion

AI insurance risk

AI infrastructure is creating a difficult question for the insurance industry, and the answer cannot be found in the performance

Control System Obsolescence

AI Infrastructure Buyers May Be Overlooking the Systems That Keep Their Facilities Operational A newly commissioned AI data center can

Neocloud data retention

Neocloud Data Retention Is Becoming a Customer-Control Question An AI infrastructure contract should not leave customers guessing about what happens

Orbital

Next-generation AI infrastructure may be heading into space, with AI compute hardware being deployed on satellites hundreds of miles above

Climate risk pricing

The next big challenge for Data center investors could stem from the underlying risks associated with the physical environment. Buildings

Virtual Power Plants

A hyperscale data center increasingly competes for something that conventional power procurement cannot guarantee: dependable electricity at the precise location

Practitioner Blogs

318 practitioner blogs

The problem in a data center often becomes visible before anyone understands what happens inside

AI sovereignty increasingly depends on a country’s ability to operate computing infrastructure without surrendering control

A cooling schedule rarely slips over a chiller; it slips over an assumption that nobody

A data center can look fully accounted for on a financial statement while carrying significant

Industry Intelligence

46 reports & datasets

As AI accelerates infrastructure demand, power delivery is becoming the defining constraint of scale.

Speed has become the defining currency of the AI era. But in the race to deploy faster, scale bigger, and

As artificial intelligence evolves from experimental deployments into foundational digital infrastructure, the conversation is increasingly shifting beyond model performance toward

Scroll to Top