...
.Nscale Locks $3.5 Billion Figure Robotics Compute Deal  ·Qatar’s Meeza Lands Major Hyperscaler Deal for 8MW ·Qualcomm Strikes Amazon AI Chip Deal, Opens Door to $4 Billion Stock ·Hitachi Energy Bets $300M on China Grid Manufacturing Corvex Builds Toward 8MW Cloud Infrastructure Footprint LITEON Bets $176 Million on DCX Liquid Cooling EdgeConneX Backs Singapore’s AI-Ready Tropical Data Center Testbed
.Nscale Locks $3.5 Billion Figure Robotics Compute Deal  ·Qatar’s Meeza Lands Major Hyperscaler Deal for 8MW ·Qualcomm Strikes Amazon AI Chip Deal, Opens Door to $4 Billion Stock ·Hitachi Energy Bets $300M on China Grid Manufacturing Corvex Builds Toward 8MW Cloud Infrastructure Footprint LITEON Bets $176 Million on DCX Liquid Cooling EdgeConneX Backs Singapore’s AI-Ready Tropical Data Center Testbed

Indian Data Center Firm Henox Expands Connectivity Plans

Indian data center firm Henox outlines coordinated expansion We are reporting on new infrastructure plans as Indian data center firm

Share
Indian Data Center

Indian data center firm Henox outlines coordinated expansion

We are reporting on new infrastructure plans as Indian data center firm Henox advances projects across western and southern India. The company has detailed a proposed cable landing station in Gujarat and a 100MW data center in Tamil Nadu. Together, these initiatives connect subsea access, terrestrial fiber, and compute capacity.

Importantly, the announcements align with how digital traffic moves today. As a result, connectivity and capacity planning are increasingly linked. In this context, Indian data center firm Henox is positioning its assets to support regional and national demand.

Cable landing station plans in Gujarat

This week, Henox IT & Datacenters Private Limited signed a memorandum of understanding with the Government of Gujarat and Gujarat International Finance Tec-City (GIFT City). The MoU covers a new cable landing station at Dhuvaran. It also includes a dedicated high-capacity fiber route into GIFT City.

Under the agreement, Indian data center firm Henox will act as a strategic technology partner. Specifically, the company will design, build, and operate the cable landing station. In addition, it will manage the terrestrial backhaul. However, the parties did not disclose technical specifications.

Positioning Gujarat within India’s subsea network

At present, no submarine cables land in Gujarat. Instead, most west coast cables terminate in Mumbai. Meanwhile, some land further south in Kochi. Because of this, Gujarat has remained outside major subsea routes.

Previously, in October 2022, the Government of Gujarat signed an MoU with Lightstorm, an I Squared-owned network firm. That agreement proposed the state’s first submarine cable landing station. However, the current status of that project remains unclear.

Against this background, the Henox proposal introduces another pathway. Consequently, it could broaden west coast connectivity options, particularly for enterprise and financial hubs such as GIFT City.

Tamil Nadu data center development under Project Horizon

Alongside the Gujarat announcement, Indian data center firm Henox also outlined plans for a 100MW data center in Tamil Nadu. The facility forms part of Project Horizon. This initiative targets large-scale digital infrastructure across the state.

Under Project Horizon, Henox Data Centers plans to invest Rs 50,000 crore ($5.5bn). The investment spans data centers, cable landing stations, subsea cables, and solar projects. Nevertheless, the company did not share locations, specifications, or timelines. Within the state, Chennai remains the primary data center market.

Investment backing and partner perspectives

The project is backed by Maverick Investments Limited, part of UAE-based Siraj Holdings Group. Initially, the firm will invest Rs 200 crore ($2.2m) in the data center.

Khadeer Peer Shariff, chairman of Maverick Investments Limited, said:
“Project Horizon is a watershed moment for the Siraj Holdings Group. Our Rs 50,000 Crore commitment with Henox reflects deep confidence in Tamil Nadu’s future and India’s digital expansion. We are laying the foundation for the state’s technological renaissance.”

Shaktivel K, CEO of Henox Data Centers, added:
“This partnership brings together sustainable infrastructure, subsea connectivity, and AI-ready capacity on an unprecedented scale. Project Horizon is one of India’s most ambitious digital infrastructure initiatives and will unlock massive economic potential for the region.”

Existing deployments and regional integration

Earlier this year, Henox launched an edge data center in GIFT City. This deployment established an operational footprint in Gujarat. When viewed together, the edge site, the proposed cable landing station, and the planned Tamil Nadu facility show a distributed strategy.

Moreover, the approach reflects how capacity and connectivity are converging. As traffic grows, regional diversity becomes essential. Therefore, Indian data center firm Henox is aligning assets across multiple states.

[simple-author-box]

More from AI Infrastructure

VIRTUS Data Centres has secured a £2.45 billion financing package to support its next

A consortium backed by BlackRock Inc. and IFM Investors has entered exclusive talks to

Vertiv Holdings Co. is moving deeper into the AI infrastructure services market through an

COMPUTE WEEKLY

The briefing that 40,000+ tech leaders read every Monday. Sharp, fast, essential.

Building an AI Startup Without Owning GPUs

Not owning GPUs has become the default, deliberate strategy for building an AI company — not a compromise founders accept reluctantly. H100 rental rates fell 64-75% in fifteen months, a dense ecosystem of neoclouds and inference-as-a-service providers now lets startups skip infrastructure entirely, and credit programs can fund a company’s first year before a founder writes a check
Most Read

A compute node sitting behind a garage door can perform the same basic computational

A project can leave a site without leaving behind the conditions that made the

A commercial operation date can look precise long before the underlying project is capable

A 5 GW AI infrastructure plan can satisfy every conventional site-selection requirement and still

A fire strategy becomes expensive when the building has already decided where walls, equipment,

Disruptor Spotlight

Cerebras Systems

The chip that makes Nvidia nervous. Cerebras’ Wafer Scale Engine is rewriting the rules of AI inference at scale.
Faster
0 x
YoY Revenue
0 x
Transistors
0 T
Market Pulse
MSFT
+1.02%
NVDA
+0.66%
AMZN
-0.078%
AMD
-6.95%
TSMC
-2.98%
Indicative only · Not financial advice
Upcoming Events
SEP
The AI Infrastructure Race (India)
WEBINAR · ONLINE
The AI Infrastructure Race: Won on Power, Land and Trust — Not Capital
MAY
0
AI Infrastructure Summit
DUBAI · IN PERSON
MEA’s premier AI infrastructure event.
JUN
0 0
Compute Forecast Summit
SINGAPORE · IN PERSON
Our flagship APAC event. Early bird open.
Latest Moves
Live
ecolab
Ecolab Deepens Cooling Strategy With $4.75B CoolIT Acquisition
Ecolab is making one of its biggest moves yet into AI infrastructure after completing its $4.75 billion acquisition of liquid cooling specialist CoolIT Systems
Pure DC AVK Europe data center microgrid Dublin 110MW AI infrastructure Ireland 2026
Pure DC and AVK Deploy Europe’s First 110 MW Data Center Microgrid in Dublin
The Pure DC Dublin microgrid has made history as Europe’s first large-scale on-site data center microgrid, launched in partnership with power solutions provider AVK at Pure DC’s campus in Ireland.
Pace Digitek
Pace Digitek Partners With MEGMEET to Expand AI Data Center Power Business
India’s AI infrastructure ecosystem continues to mature as domestic technology manufacturers move beyond traditional telecommunications and industrial markets toward high-growth digital infrastructure opportunities
Follow Compute Forecast
11K followers
1200 followers
Companies to Watch
CW
CoreWeave
Neo Cloud · $19B · IPO Watch
CB
Cerebras Systems
AI Hardware · $4.25B · Pre-IPO
G42
G42
Sovereign AI · Abu Dhabi
H
Humain
Saudi AI · $40B Fund
Latest Podcast
AI Capex, Cloud Margins & the Nuclear Bet
48 MIN · 25 APR 2026

Indian Data Center Firm Henox Expands Connectivity Plans

Indian data center firm Henox outlines coordinated expansion We are reporting on new infrastructure plans as Indian data center firm

Share
Indian Data Center
15
847 SHARES

0
SHARES

[simple-author-box]

More from AI Infrastructure

A compute node sitting behind a garage door can perform the same basic computational

A project can leave a site without leaving behind the conditions that made the

A commercial operation date can look precise long before the underlying project is capable

A 5 GW AI infrastructure plan can satisfy every conventional site-selection requirement and still

COMPUTE WEEKLY

The briefing that 40,000+ tech leaders read every Monday. Sharp, fast, essential.

Great! We’ve received your information.

Global AI Infrastructure Outlook 2026

The briefing that 40,000+ tech leaders read every Monday. Sharp, fast, essential.
Download Free
Most Read

A compute node sitting behind a garage door can perform the same basic computational

A project can leave a site without leaving behind the conditions that made the

A commercial operation date can look precise long before the underlying project is capable

A 5 GW AI infrastructure plan can satisfy every conventional site-selection requirement and still

A fire strategy becomes expensive when the building has already decided where walls, equipment,

Disruptor Spotlight

Cerebras Systems

The chip that makes Nvidia nervous. Cerebras’ Wafer Scale Engine is rewriting the rules of AI inference at scale.
Faster
0 x
YoY Revenue
0 x
Transistors
0 T
Market Pulse
NVDA
$924.60
+2.4%
MSFT
$421.30
+1.1%
AMZN
$192.80
-0.6%
NVDA
$924.60
+2.4%
NVDA
$924.60
+2.4%
Indicative only · Not financial advice
Upcoming Events
MAY
0 0
DCD Global — London
LONDON · IN PERSON
World’s largest DC event. CF is media partner.
MAY
0
AI Infrastructure Summit
DUBAI · IN PERSON
MEA’s premier AI infrastructure event.
JUN
0 0

Compute Forecast Summit

SINGAPORE · IN PERSON
Our flagship APAC event. Early bird open.
Latest Moves
  • Live
Sam Altman
OpenAI appoints new Chief Infrastructure Officer to lead $100B DC programme
27 APR · OPENAI
Sam Altman
OpenAI appoints new Chief Infrastructure Officer to lead $100B DC programme
27 APR · OPENAI
Sam Altman
OpenAI appoints new Chief Infrastructure Officer to lead $100B DC programme
27 APR · OPENAI
Follow Compute Forecast
18.4K followers
12.1K followers
9.3K subscribers
41 episodes
Companies to Watch
CW
CoreWeave
Neo Cloud · $19B · IPO Watch
CB
Cerebras Systems
AI Hardware · $4.25B · Pre-IPO
G42
G42
Sovereign AI · Abu Dhabi
CW
Humain
Saudi AI · $40B Fund
Latest Podcast
AI Capex, Cloud Margins & the Nuclear Bet
48 MIN · 25 APR 2026
Scroll to Top
Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.