.Nscale Locks $3.5 Billion Figure Robotics Compute Deal  ·Qatar’s Meeza Lands Major Hyperscaler Deal for 8MW ·Qualcomm Strikes Amazon AI Chip Deal, Opens Door to $4 Billion Stock ·Hitachi Energy Bets $300M on China Grid Manufacturing Corvex Builds Toward 8MW Cloud Infrastructure Footprint LITEON Bets $176 Million on DCX Liquid Cooling EdgeConneX Backs Singapore’s AI-Ready Tropical Data Center Testbed
.Nscale Locks $3.5 Billion Figure Robotics Compute Deal  ·Qatar’s Meeza Lands Major Hyperscaler Deal for 8MW ·Qualcomm Strikes Amazon AI Chip Deal, Opens Door to $4 Billion Stock ·Hitachi Energy Bets $300M on China Grid Manufacturing Corvex Builds Toward 8MW Cloud Infrastructure Footprint LITEON Bets $176 Million on DCX Liquid Cooling EdgeConneX Backs Singapore’s AI-Ready Tropical Data Center Testbed

Boyd

bd

Boyd

Thermal management • Materials science • Data centres • EV • Electronics

Company Bio

Boyd is a global engineering and manufacturing company developing thermal, sealing, shielding and material solutions for advanced electronics and other demanding applications. Its technologies are used in data centres, 5G, electric vehicles, healthcare and aerospace.
Founded
1928
Headquarters
Boca Raton, Florida, USA
Employees
~5,000+
Markets
Thermal management

Specialisms

Contact Details

Call

+1 614 888 0246 (corporate)

Email

info@motivaircorp.com

Website

boydcorp.com

Head Office

2424 N. Federal Highway, Suite 318, Boca Raton, FL 33431, USA

Request Information

Send an enquiry direct to the team and get a response within two business days.
Gated Resources
Resources & Downloads
Whitepapers, e-guides, reports, and analysis published by this company. Registration required — leads are shared
directly with the publisher.
Whitepaper
The 2026 DCIM Buyer’s Guide
What to evaluate before committing to a platform — data models, integration depth, and total cost over a five-year horizon.
PDF · 28 PAGES · APR 2026
Download — Register →
E-Guide
Capacity Planning for High-Density AI Halls
A practical walkthrough of power and thermal headroom modelling before deploying liquid-ready racks.
PDF · 18 PAGES · MAR 2026
Download — Register →
Report
Global Data Centre Efficiency Benchmark
PUE, WUE, and utilisation benchmarks drawn from 1,400 monitored facilities across 40 markets.
PDF · 46 PAGES · FEB 2026
Download — Register →
Analysis
Why Stranded Capacity Costs More Than You Think
An analysis of recoverable capacity across enterprise estates, and the monitoring gaps that hide it.
PDF · 12 PAGES · JAN 2026
Download — Register →
Free registration · One form unlocks every resource on this profile.
Listed in Directory AI? Upgrade to Premium.

Premium members publish gated whitepapers, e-guides, reports, and analysis on their profile — and receive every lead generated.

Scroll to Top