.Nscale Locks $3.5 Billion Figure Robotics Compute Deal  ·Qatar’s Meeza Lands Major Hyperscaler Deal for 8MW ·Qualcomm Strikes Amazon AI Chip Deal, Opens Door to $4 Billion Stock ·Hitachi Energy Bets $300M on China Grid Manufacturing Corvex Builds Toward 8MW Cloud Infrastructure Footprint LITEON Bets $176 Million on DCX Liquid Cooling EdgeConneX Backs Singapore’s AI-Ready Tropical Data Center Testbed
.Nscale Locks $3.5 Billion Figure Robotics Compute Deal  ·Qatar’s Meeza Lands Major Hyperscaler Deal for 8MW ·Qualcomm Strikes Amazon AI Chip Deal, Opens Door to $4 Billion Stock ·Hitachi Energy Bets $300M on China Grid Manufacturing Corvex Builds Toward 8MW Cloud Infrastructure Footprint LITEON Bets $176 Million on DCX Liquid Cooling EdgeConneX Backs Singapore’s AI-Ready Tropical Data Center Testbed

Corintis

c

Corintis

Data centre cooling • Heat reuse • AI infrastructure • Thermal management

Company Bio

Corintis develops advanced cooling and heat-reuse solutions for data centres, with a focus on high-density compute and AI. Its approach combines liquid cooling, infrastructure design and thermal optimization to reduce energy use and enable useful heat recovery.
Founded
2021
Headquarters
Lausanne, Switzerland
Employees
~50–100
Markets
Data centre cooling

Specialisms

Contact Details

Call

+1 614 888 0246 (corporate)

Email

info@motivaircorp.com

Website

corintis.com

Head Office

Lausanne, Switzerland

Request Information

Send an enquiry direct to the team and get a response within two business days.
Gated Resources
Resources & Downloads
Whitepapers, e-guides, reports, and analysis published by this company. Registration required — leads are shared
directly with the publisher.
Whitepaper
The 2026 DCIM Buyer’s Guide
What to evaluate before committing to a platform — data models, integration depth, and total cost over a five-year horizon.
PDF · 28 PAGES · APR 2026
Download — Register →
E-Guide
Capacity Planning for High-Density AI Halls
A practical walkthrough of power and thermal headroom modelling before deploying liquid-ready racks.
PDF · 18 PAGES · MAR 2026
Download — Register →
Report
Global Data Centre Efficiency Benchmark
PUE, WUE, and utilisation benchmarks drawn from 1,400 monitored facilities across 40 markets.
PDF · 46 PAGES · FEB 2026
Download — Register →
Analysis
Why Stranded Capacity Costs More Than You Think
An analysis of recoverable capacity across enterprise estates, and the monitoring gaps that hide it.
PDF · 12 PAGES · JAN 2026
Download — Register →
Free registration · One form unlocks every resource on this profile.
Listed in Directory AI? Upgrade to Premium.

Premium members publish gated whitepapers, e-guides, reports, and analysis on their profile — and receive every lead generated.

Scroll to Top