.Nscale Locks $3.5 Billion Figure Robotics Compute Deal  ·Qatar’s Meeza Lands Major Hyperscaler Deal for 8MW ·Qualcomm Strikes Amazon AI Chip Deal, Opens Door to $4 Billion Stock ·Hitachi Energy Bets $300M on China Grid Manufacturing Corvex Builds Toward 8MW Cloud Infrastructure Footprint LITEON Bets $176 Million on DCX Liquid Cooling EdgeConneX Backs Singapore’s AI-Ready Tropical Data Center Testbed
.Nscale Locks $3.5 Billion Figure Robotics Compute Deal  ·Qatar’s Meeza Lands Major Hyperscaler Deal for 8MW ·Qualcomm Strikes Amazon AI Chip Deal, Opens Door to $4 Billion Stock ·Hitachi Energy Bets $300M on China Grid Manufacturing Corvex Builds Toward 8MW Cloud Infrastructure Footprint LITEON Bets $176 Million on DCX Liquid Cooling EdgeConneX Backs Singapore’s AI-Ready Tropical Data Center Testbed

Vertiv Brings Converged Physical Infrastructure to NVIDIA Vera Rubin DSX AI Factories

Simulation-ready power and cooling infrastructure models, designed to accelerate deployment and reduce execution risk LONDON, UK, March 17, 2026 –

Share
Scott Armul

Simulation-ready power and cooling infrastructure models, designed to accelerate deployment and reduce execution risk

LONDON, UK, March 17, 2026 – Vertiv (NYSE: VRT), a global leader in critical digital infrastructure, today announced its role in advancing converged physical infrastructure designs for the NVIDIA Vera Rubin DSX AI factory reference design and the NVIDIA Omniverse DSX Blueprint.

As AI factories scale in density, complexity, and power demand, operators are under pressure to compress time to deployment, improve infrastructure utilisation, and reduce integration risk. A new infrastructure design approach that reduces complexity, improves confidence before buildout, and accelerates time to capacity is now available to meet these evolving needs. Through its work with NVIDIA, Vertiv is contributing simulation-ready, or DSX SimReady digital power and cooling assets, validated interfaces, and repeatable infrastructure building blocks designed to help customers deploy AI factories faster and with greater operational assurance.

This work reflects an expansion of Vertiv’s established approach to converged physical infrastructure – a system-level model that integrates power, cooling, controls, and services into interdependent designs optimised across the full power train and thermal chain. This approach is enabled through five foundational elements: repeatable building blocks, defined interfaces, system orchestration, digital continuity, and lifecycle support. Together, these elements support more scalable AI factory execution by helping reduce design complexity, strengthen coordination across infrastructure domains, and improve confidence from initial design through deployment and operation.

At the core of this approach is a scalable building block architecture designed around the standardised 12.5MW infrastructure blocks of Vertiv™ OneCore integrated modular solutions that can be combined, configured, and extended to support deployments ranging from smaller AI clusters to gigawatt-scale AI factories. By establishing repeatable block-level designs with validated interfaces, Vertiv aims to simplify scaling while improving deployment consistency, system coordination, and operational performance.

“AI factories are forcing a fundamental change in how digital infrastructure is designed, validated, and deployed,” said Scott Armul, chief product and technology officer at Vertiv. “Vertiv’s role is to help turn complex AI infrastructure from a collection of separate products into converged, simulation-ready physical systems. Working with NVIDIA, we are helping customers move faster from design to deployment. By combining our power and cooling portfolio with validated interfaces and digital models, we can help customers accelerate development, improve operational confidence, and unlock better output per watt.”

Vertiv’s collaboration supports the development of digitally validated AI factory infrastructure using real-time simulation and system-level modelling before physical deployment begins. This approach is designed to help customers:

·       reduce deployment complexity and field integration risk,

·       accelerate time to operational readiness,

·       improve infrastructure coordination across power, cooling, and controls,

·       and optimise performance from grid connection through chip-level thermal management and heat-reuse pathways.

Vertiv’s contribution is grounded in its ability to bring together one of the industry’s most complete portfolios of critical power, thermal management, integrated controls, and lifecycle services into a cohesive converged physical infrastructure. Unlike conventional modular or prefabricated approaches that primarily compress schedule, converged physical infrastructure is intended to deliver both deployment speed and compounding system-level gains. By standardising interfaces and creating repeatable building blocks, Vertiv aims to support more scalable AI factory execution while enabling improved performance, efficiency, and reliability.

“As AI factories scale to unprecedented levels of power and density, enterprises require a converged approach to physical infrastructure that unifies power, cooling, and digital twin simulation to reduce deployment risk,” said Vladimir Troy, vice president of AI Infrastructure at NVIDIA. “By integrating simulation-ready infrastructure models into the NVIDIA Vera Rubin DSX design, Vertiv is providing the repeatable building blocks and validated interfaces necessary to accelerate the path from design to operational readiness.”

This collaborative output, Vertiv™ OneCore Rubin DSX, is a design outcome grounded in converged physical infrastructure that Vertiv will continue to iterate for multiple compute generations ahead. It is intended to support AI factory builders with parameterised infrastructure models and deployment-ready building blocks that span power, cooling, controls, and lifecycle services.

Vertiv expects this work to inform future converged infrastructure offerings across hyperscale, colocation, enterprise, and emerging AI deployment environments.

For more information on Vertiv solutions for AI infrastructure, visit Vertiv.com.

# # #

About Vertiv

Vertiv (NYSE: VRT) brings together hardware, software, analytics and ongoing services to enable its customers’ vital applications to run continuously, perform optimally and grow with their business needs. Vertiv solves the most important challenges facing today’s data centres, communication networks and commercial and industrial facilities with a portfolio of power, cooling and IT infrastructure solutions and services that extends from the cloud to the edge of the network. Headquartered in Westerville, Ohio, USA, Vertiv does business in more than 130 countries. For more information, and for the latest news and content from Vertiv, visit Vertiv.com.

Forward-looking statements

This release contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, Section 27 of the Securities Act, and Section 21E of the Securities Exchange Act. These statements are only a prediction. Actual events or results may differ materially from those in the forward-looking statements set forth herein. Readers are referred to Vertiv’s filings with the Securities and Exchange Commission, including its most recent Annual Report on Form 10-K and any subsequent Quarterly Reports on Form 10-Q for a discussion of these and other important risk factors concerning Vertiv and its operations. Vertiv is under no obligation to, and expressly disclaims any obligation to, update or alter its forward-looking statements, whether as a result of new information, future events or otherwise

[simple-author-box]

More from AI Infrastructure

SURF has selected Eurofiber to host a new large-scale AI facility in Groningen, marking

O-Green, a state-backed renewable energy company in Oman, plans to bring more than 200MW

Nabiax has begun construction of Alcalá Data Center 3 (ADC3) in Alcalá de Henares,

COMPUTE WEEKLY

The briefing that 40,000+ tech leaders read every Monday. Sharp, fast, essential.

Building an AI Startup Without Owning GPUs

Not owning GPUs has become the default, deliberate strategy for building an AI company — not a compromise founders accept reluctantly. H100 rental rates fell 64-75% in fifteen months, a dense ecosystem of neoclouds and inference-as-a-service providers now lets startups skip infrastructure entirely, and credit programs can fund a company’s first year before a founder writes a check
Most Read

A compute node sitting behind a garage door can perform the same basic computational

A project can leave a site without leaving behind the conditions that made the

A commercial operation date can look precise long before the underlying project is capable

A 5 GW AI infrastructure plan can satisfy every conventional site-selection requirement and still

A fire strategy becomes expensive when the building has already decided where walls, equipment,

Disruptor Spotlight

Cerebras Systems

The chip that makes Nvidia nervous. Cerebras’ Wafer Scale Engine is rewriting the rules of AI inference at scale.
Faster
0 x
YoY Revenue
0 x
Transistors
0 T
Market Pulse
MSFT
+1.02%
NVDA
+0.66%
AMZN
-0.078%
AMD
-6.95%
TSMC
-2.98%
Indicative only · Not financial advice
Upcoming Events
SEP
The AI Infrastructure Race (India)
WEBINAR · ONLINE
The AI Infrastructure Race: Won on Power, Land and Trust — Not Capital
MAY
0
AI Infrastructure Summit
DUBAI · IN PERSON
MEA’s premier AI infrastructure event.
JUN
0 0
Compute Forecast Summit
SINGAPORE · IN PERSON
Our flagship APAC event. Early bird open.
Latest Moves
Live
ecolab
Ecolab Deepens Cooling Strategy With $4.75B CoolIT Acquisition
Ecolab is making one of its biggest moves yet into AI infrastructure after completing its $4.75 billion acquisition of liquid cooling specialist CoolIT Systems
Pure DC AVK Europe data center microgrid Dublin 110MW AI infrastructure Ireland 2026
Pure DC and AVK Deploy Europe’s First 110 MW Data Center Microgrid in Dublin
The Pure DC Dublin microgrid has made history as Europe’s first large-scale on-site data center microgrid, launched in partnership with power solutions provider AVK at Pure DC’s campus in Ireland.
Pace Digitek
Pace Digitek Partners With MEGMEET to Expand AI Data Center Power Business
India’s AI infrastructure ecosystem continues to mature as domestic technology manufacturers move beyond traditional telecommunications and industrial markets toward high-growth digital infrastructure opportunities
Follow Compute Forecast
11K followers
1200 followers
Companies to Watch
CW
CoreWeave
Neo Cloud · $19B · IPO Watch
CB
Cerebras Systems
AI Hardware · $4.25B · Pre-IPO
G42
G42
Sovereign AI · Abu Dhabi
H
Humain
Saudi AI · $40B Fund
Latest Podcast
AI Capex, Cloud Margins & the Nuclear Bet
48 MIN · 25 APR 2026

Vertiv Brings Converged Physical Infrastructure to NVIDIA Vera Rubin DSX AI Factories

Simulation-ready power and cooling infrastructure models, designed to accelerate deployment and reduce execution risk LONDON, UK, March 17, 2026 –

Share
Scott Armul
36
847 SHARES

0
SHARES

[simple-author-box]

More from AI Infrastructure

A compute node sitting behind a garage door can perform the same basic computational

A project can leave a site without leaving behind the conditions that made the

A commercial operation date can look precise long before the underlying project is capable

A 5 GW AI infrastructure plan can satisfy every conventional site-selection requirement and still

COMPUTE WEEKLY

The briefing that 40,000+ tech leaders read every Monday. Sharp, fast, essential.

Great! We’ve received your information.

Global AI Infrastructure Outlook 2026

The briefing that 40,000+ tech leaders read every Monday. Sharp, fast, essential.
Download Free
Most Read

A compute node sitting behind a garage door can perform the same basic computational

A project can leave a site without leaving behind the conditions that made the

A commercial operation date can look precise long before the underlying project is capable

A 5 GW AI infrastructure plan can satisfy every conventional site-selection requirement and still

A fire strategy becomes expensive when the building has already decided where walls, equipment,

Disruptor Spotlight

Cerebras Systems

The chip that makes Nvidia nervous. Cerebras’ Wafer Scale Engine is rewriting the rules of AI inference at scale.
Faster
0 x
YoY Revenue
0 x
Transistors
0 T
Market Pulse
NVDA
$924.60
+2.4%
MSFT
$421.30
+1.1%
AMZN
$192.80
-0.6%
NVDA
$924.60
+2.4%
NVDA
$924.60
+2.4%
Indicative only · Not financial advice
Upcoming Events
MAY
0 0
DCD Global — London
LONDON · IN PERSON
World’s largest DC event. CF is media partner.
MAY
0
AI Infrastructure Summit
DUBAI · IN PERSON
MEA’s premier AI infrastructure event.
JUN
0 0

Compute Forecast Summit

SINGAPORE · IN PERSON
Our flagship APAC event. Early bird open.
Latest Moves
  • Live
Sam Altman
OpenAI appoints new Chief Infrastructure Officer to lead $100B DC programme
27 APR · OPENAI
Sam Altman
OpenAI appoints new Chief Infrastructure Officer to lead $100B DC programme
27 APR · OPENAI
Sam Altman
OpenAI appoints new Chief Infrastructure Officer to lead $100B DC programme
27 APR · OPENAI
Follow Compute Forecast
18.4K followers
12.1K followers
9.3K subscribers
41 episodes
Companies to Watch
CW
CoreWeave
Neo Cloud · $19B · IPO Watch
CB
Cerebras Systems
AI Hardware · $4.25B · Pre-IPO
G42
G42
Sovereign AI · Abu Dhabi
CW
Humain
Saudi AI · $40B Fund
Latest Podcast
AI Capex, Cloud Margins & the Nuclear Bet
48 MIN · 25 APR 2026
Scroll to Top