.Nscale Locks $3.5 Billion Figure Robotics Compute Deal  ·Qatar’s Meeza Lands Major Hyperscaler Deal for 8MW ·Qualcomm Strikes Amazon AI Chip Deal, Opens Door to $4 Billion Stock ·Hitachi Energy Bets $300M on China Grid Manufacturing Corvex Builds Toward 8MW Cloud Infrastructure Footprint LITEON Bets $176 Million on DCX Liquid Cooling EdgeConneX Backs Singapore’s AI-Ready Tropical Data Center Testbed
.Nscale Locks $3.5 Billion Figure Robotics Compute Deal  ·Qatar’s Meeza Lands Major Hyperscaler Deal for 8MW ·Qualcomm Strikes Amazon AI Chip Deal, Opens Door to $4 Billion Stock ·Hitachi Energy Bets $300M on China Grid Manufacturing Corvex Builds Toward 8MW Cloud Infrastructure Footprint LITEON Bets $176 Million on DCX Liquid Cooling EdgeConneX Backs Singapore’s AI-Ready Tropical Data Center Testbed

VAST Data Raises $1 Billion at $30 Billion Valuation as AI Infrastructure Stack Takes Shape

VAST Data has closed a $1 billion Series F financing round at a $30 billion valuation, more than tripling its

Share
VAST Data Series F $1 billion $30 billion valuation AI infrastructure stack 2026

VAST Data has closed a $1 billion Series F financing round at a $30 billion valuation, more than tripling its $9.1 billion valuation from 2023. The round was led by Drive Capital and co-led by Access Industries, with participation from existing investors including Nvidia, Fidelity Management and Research, and NEA.

The New York-based company builds what it calls an AI Operating System, a software infrastructure layer that sits between hardware and AI models and manages how data is stored, moved, and retrieved at scale. As a result, its platform currently supports AI environments spanning millions of GPUs in production.

Why the VAST Data Series F Signals a Shift in AI Infrastructure Investment

The raise reflects a shift in where capital is moving. For two years, funding concentrated at the model layer. Now investors are backing the infrastructure beneath it — specifically the companies that determine how fast data can reach compute at scale.

Training and running AI models at the scale that hyperscalers and neoclouds now operate requires managing multi-exabyte datasets with speed and reliability that older distributed storage architectures cannot provide. VAST’s disaggregated shared-everything architecture addresses exactly this problem. As Nvidia CEO Jensen Huang put it in a recent video accompanying the announcement, without software like VAST’s, even the fastest AI processors face severe data bottlenecks.

The company reported more than $4 billion in cumulative bookings and over $500 million in committed annual recurring revenue at the time of closing. VAST has been cash-flow positive for several years and did not raise the round out of operational necessity. CEO Renen Hallak said inbound investor demand entirely drove the size of the round.

Who Is Already Using It and What Comes Next

Customers include CoreWeave, xAI, Mistral AI, the US Air Force, JPMorganChase, and Cursor. Contracts typically run five to seven years. Once organisations integrate VAST’s platform into their AI workflows, switching costs are high and churn is low.

Mistral AI co-founder and CTO Timothée Lacroix described the platform as essential for managing and scaling the massive datasets required to train frontier models at speed. That kind of endorsement from a frontier lab signals that VAST has moved from a storage vendor to a core piece of the AI stack.

Hallak said the company is targeting IPO-readiness by the end of 2026, though no formal timeline has been set. Primary proceeds will fund geographic expansion into Latin America, India, and China, as well as strategic acquisitions that extend VAST’s technology footprint. As we have covered previously, the unit economics of neocloud infrastructure increasingly depend on how efficiently data moves between storage and compute. VAST’s $30 billion valuation is the market’s answer to how much that problem is worth solving.

[simple-author-box]

More from AI Infrastructure

SURF has selected Eurofiber to host a new large-scale AI facility in Groningen, marking

O-Green, a state-backed renewable energy company in Oman, plans to bring more than 200MW

Nabiax has begun construction of Alcalá Data Center 3 (ADC3) in Alcalá de Henares,

COMPUTE WEEKLY

The briefing that 40,000+ tech leaders read every Monday. Sharp, fast, essential.

Building an AI Startup Without Owning GPUs

Not owning GPUs has become the default, deliberate strategy for building an AI company — not a compromise founders accept reluctantly. H100 rental rates fell 64-75% in fifteen months, a dense ecosystem of neoclouds and inference-as-a-service providers now lets startups skip infrastructure entirely, and credit programs can fund a company’s first year before a founder writes a check
Most Read

A compute node sitting behind a garage door can perform the same basic computational

A project can leave a site without leaving behind the conditions that made the

A commercial operation date can look precise long before the underlying project is capable

A 5 GW AI infrastructure plan can satisfy every conventional site-selection requirement and still

A fire strategy becomes expensive when the building has already decided where walls, equipment,

Disruptor Spotlight

Cerebras Systems

The chip that makes Nvidia nervous. Cerebras’ Wafer Scale Engine is rewriting the rules of AI inference at scale.
Faster
0 x
YoY Revenue
0 x
Transistors
0 T
Market Pulse
MSFT
+1.02%
NVDA
+0.66%
AMZN
-0.078%
AMD
-6.95%
TSMC
-2.98%
Indicative only · Not financial advice
Upcoming Events
SEP
The AI Infrastructure Race (India)
WEBINAR · ONLINE
The AI Infrastructure Race: Won on Power, Land and Trust — Not Capital
MAY
0
AI Infrastructure Summit
DUBAI · IN PERSON
MEA’s premier AI infrastructure event.
JUN
0 0
Compute Forecast Summit
SINGAPORE · IN PERSON
Our flagship APAC event. Early bird open.
Latest Moves
Live
ecolab
Ecolab Deepens Cooling Strategy With $4.75B CoolIT Acquisition
Ecolab is making one of its biggest moves yet into AI infrastructure after completing its $4.75 billion acquisition of liquid cooling specialist CoolIT Systems
Pure DC AVK Europe data center microgrid Dublin 110MW AI infrastructure Ireland 2026
Pure DC and AVK Deploy Europe’s First 110 MW Data Center Microgrid in Dublin
The Pure DC Dublin microgrid has made history as Europe’s first large-scale on-site data center microgrid, launched in partnership with power solutions provider AVK at Pure DC’s campus in Ireland.
Pace Digitek
Pace Digitek Partners With MEGMEET to Expand AI Data Center Power Business
India’s AI infrastructure ecosystem continues to mature as domestic technology manufacturers move beyond traditional telecommunications and industrial markets toward high-growth digital infrastructure opportunities
Follow Compute Forecast
11K followers
1200 followers
Companies to Watch
CW
CoreWeave
Neo Cloud · $19B · IPO Watch
CB
Cerebras Systems
AI Hardware · $4.25B · Pre-IPO
G42
G42
Sovereign AI · Abu Dhabi
H
Humain
Saudi AI · $40B Fund
Latest Podcast
AI Capex, Cloud Margins & the Nuclear Bet
48 MIN · 25 APR 2026

VAST Data Raises $1 Billion at $30 Billion Valuation as AI Infrastructure Stack Takes Shape

VAST Data has closed a $1 billion Series F financing round at a $30 billion valuation, more than tripling its

Share
VAST Data Series F $1 billion $30 billion valuation AI infrastructure stack 2026
58
847 SHARES

0
SHARES

[simple-author-box]

More from AI Infrastructure

A compute node sitting behind a garage door can perform the same basic computational

A project can leave a site without leaving behind the conditions that made the

A commercial operation date can look precise long before the underlying project is capable

A 5 GW AI infrastructure plan can satisfy every conventional site-selection requirement and still

COMPUTE WEEKLY

The briefing that 40,000+ tech leaders read every Monday. Sharp, fast, essential.

Great! We’ve received your information.

Global AI Infrastructure Outlook 2026

The briefing that 40,000+ tech leaders read every Monday. Sharp, fast, essential.
Download Free
Most Read

A compute node sitting behind a garage door can perform the same basic computational

A project can leave a site without leaving behind the conditions that made the

A commercial operation date can look precise long before the underlying project is capable

A 5 GW AI infrastructure plan can satisfy every conventional site-selection requirement and still

A fire strategy becomes expensive when the building has already decided where walls, equipment,

Disruptor Spotlight

Cerebras Systems

The chip that makes Nvidia nervous. Cerebras’ Wafer Scale Engine is rewriting the rules of AI inference at scale.
Faster
0 x
YoY Revenue
0 x
Transistors
0 T
Market Pulse
NVDA
$924.60
+2.4%
MSFT
$421.30
+1.1%
AMZN
$192.80
-0.6%
NVDA
$924.60
+2.4%
NVDA
$924.60
+2.4%
Indicative only · Not financial advice
Upcoming Events
MAY
0 0
DCD Global — London
LONDON · IN PERSON
World’s largest DC event. CF is media partner.
MAY
0
AI Infrastructure Summit
DUBAI · IN PERSON
MEA’s premier AI infrastructure event.
JUN
0 0

Compute Forecast Summit

SINGAPORE · IN PERSON
Our flagship APAC event. Early bird open.
Latest Moves
  • Live
Sam Altman
OpenAI appoints new Chief Infrastructure Officer to lead $100B DC programme
27 APR · OPENAI
Sam Altman
OpenAI appoints new Chief Infrastructure Officer to lead $100B DC programme
27 APR · OPENAI
Sam Altman
OpenAI appoints new Chief Infrastructure Officer to lead $100B DC programme
27 APR · OPENAI
Follow Compute Forecast
18.4K followers
12.1K followers
9.3K subscribers
41 episodes
Companies to Watch
CW
CoreWeave
Neo Cloud · $19B · IPO Watch
CB
Cerebras Systems
AI Hardware · $4.25B · Pre-IPO
G42
G42
Sovereign AI · Abu Dhabi
CW
Humain
Saudi AI · $40B Fund
Latest Podcast
AI Capex, Cloud Margins & the Nuclear Bet
48 MIN · 25 APR 2026
Scroll to Top